Thursday, August 8, 2013
Learn artificial grass a few technical terms explained
Learn artificial grass a few technical terms explained
TurfSoccer you understand artificial grass with several professional phrases. Each industry, each product has its fixed jargon, artificial grass as well. Below we explain artificial grass for a few critical jargon:
1 line spacing, line spacing refers to the artificial grass knitting every ridge and the distance between each ridge, usually in inches, the average spacing is 3/4 inch, 3/8 inch, 5/8 inch, 5/16 in., 5/32 inches, and so, for example converted into metric units: 3/4 inch = 1.905 cm.
(2) woven from, woven from the artificial grass is the number of knitting needles of each ridge, which is the same as carpet weaving.
3 cluster density, cluster density is the number of stitches per square meter tufting. Easy way to calculate the cluster density to knitting needles from the 20/10 cm, for example, is calculated as follows:
Spaced every few meters of woven tufted Density at
3/4 inch = 1.905 cm 52.5 20,010,500
3/8 inch = 0.9525 cm 10520021000
5/8 inch = 1.5875 cm 6320012600
5/16 inch = 0.79375 cm 12620025200
4 fineness, fineness is 10,000 meters of each blade of grass yarn weight, calculated in units of g, the relative weight is heavier wire grass quality will be better.
5 bottom cloth, generally the base fabric into the bottom fabric layer, or layer, some of the base fabric layer of the base fabric in pp mesh layer underneath, this will effectively prevent breakage of the base fabric.
6 gum, gum is below the brush at the bottom layer of plastic, from the fixed wire grass, wire grass protection against rot base fabric and so on.
Wednesday, July 17, 2013
Level sports grass control methods
Level sports grass control methods
Level control method
Will be handed over to the construction unit construction side of the grade level standard point point, arranged in the area near the site as a whole sports grass project level basis, taking fourth level of lead measured elevation cross sections to the construction within a more appropriate sides and medians where the level of the fixed point set point level II. Requires that the points on both sides of fabric line, two phases of not more than 100 meters is appropriate to set the elevation of the pile. When the measurement is carried out to the construction, the nearest point of the use of Class II, thus greatly improving the work efficiency and ensure the accuracy of measurement results.
Control Plane
a. reviewing the transfer of control point is wrong.
b. using the control point release center line of the construction control points.
Earthwork excavation
Respond venues compaction, when backfill backfill soil must meet the requirements, shall not contain impurities, organics. No backfill compaction roller can be directly used, construction methods and quality control can be carried out with reference to backfill compaction.
1, square stratified filling, the thickness of each layer of loose laying with compaction machinery and methods vary, with vibrating roller compacted. Each layer of backfill density meet the requirements only after a layer of earth backfill.
2, when the earthwork should cross the full width of filling up layer by layer into horizontal layers, each layer of filling, rolling 5 7 times, to achieve the required degree of compaction, and then fill in the floor.
3, earth filling segment, as in the two junction is not filling the same time, first fill slope of the lot shall be 1,1 to stay level, if the two simultaneously filling should overlap each tower access whose lap length shall not be less than 2M. Finished surface should be smooth daily compaction, improve drainage measures, do not water.
4, in the construction of prime soil compaction, attention should stay out of the site is not embedded rainwater pipes compacted, so as not to increase the workload of the pipe trench excavation.
5, the base with heavy soil compaction standard hierarchical compaction test subject was measured, each degree of compaction shall comply with regulatory requirements.
6, should be maintained during the construction site is always in good drainage condition and dig temporary sump to ensure that no water and from the construction site erosion damage, temporary drainage facility requirements combined with permanent facilities, taking care not affect the environment and other facilities.
7, the filling process may not have boiling spring, peeling, waves and water and so on. Rainy season, the venue at 2 ‰ slope grading, drainage and prepare the surface layer, as far as possible will be done before rain ripper paving compaction is completed, otherwise it can return to work should be to restore moisture standard construction rolling.
Earth backfill compaction phase, preferably in advance with the meteorological department to learn about recent changes in the weather conditions, do not touch the rainy day. Excavation control of both the excavation depth, non-super-dig and set elevation and slope excavation is completed using a vibrating roller compacted. If boiling phenomena, must all excavation mud, with the corner stone backfill. Overbreak strictly prohibited, and in the construction process to keep track of the depth, to find a good runway transverse slope and ditch drainage slope. Excavation of Yuni, side stone dump truck Sinotrans. RCC when lifted up from the lower rolling, rolling wheel tracks overlapping 20-30cm, with the pressure with a roller with watering can not afford at this stage until the waves rolling surface without wheel tracks so far.
Monday, July 15, 2013
artificial lawn - My Home & Garden America Yue warp
artificial lawn - My Home & Garden America Yue warp
Think of to get up the time, to see an verdant on the grass there are a few animals who cheerful play with, and my heart would be inexplicable of joy; think of the time of walk, the surround that green the green lawn, burst into Qing Chang even the birds is also chirp echoes , his face's smile respect of suddenly shake off out.
My favorite to see or the kids in the above playing when the the smiling faces of, like the a beautiful landscape painting, close your eyes, as if we tilting engraved inter-respect of came to the Hulun Buir prairie central, a few wild animal In the here frolicking, open eyes to open eyes, you only to find the original this is just the kids and their pets play with look like, they the smiling faces of seem to have magic the same as, it seems want to dragged me to go with play, and in this a lush green the soft grass upper, I long absence, felt the from the front hurried of life have lost really too much, I seem to see out of the window the sky li's white clouds looked at me and In the laugh, so I also and the kids laugh together, eventually being This an green use good mood wrapped up I .
Perhaps you yes and unbelieving, and but this is everything are true and. Because my family be regarded as compare wealthy family, Mom and Dad is also very pet me, a lot of as long as the is my idea desire, they always will help me achieve, even if it sometimes misalignment, just like this time I in the villa li the laying of artificial lawn, despite the indeed guarantee the villa li's garden activities, artificial lawn you can heighten the rockery surface of the water, the formation of scenic courtyard landscape, let people appreciate the one kinds the picturesque scenery of sensory experience, let us refreshing, state of mind open-minded, tell everyone these are not the I do not want to show off anything, just I am even more hope that we owns a there is quality of life.
I also like to use artificial lawn to decorate the house, and every time for a long time looking at computer screen after the always be able to In this a soft, Xiaocaohu the leaves li to get I gotta quiet, So I gotta imagine is not conscious of flew into the afar, however in an instant I came back, the original I still have that things were not finish the it, alarm clock Du has already Laicui me anymore. This is the morning tea of the time, so I respect of carrying his milk and chip cookies sitting in covered with balcony's TurfSoccer artificial lawn, despite the in my heart it is already more than just an unreal of the lawn up, I always fast calm down, and then imagine the with clean white sheep in front of me the way you run, and then I it is so on the grass spent a happy every second of.
So leisurely mood away from us is not a distant, we always have unlimited troubles, which requires a by virtue of come digestion our negative's state of mind, which had to lift the artificial leisure lawn, one let you are at home get relaxed and happy mood things.
If you and I the same as, both to identified a artificial lawn the magical charm, So what exactly which to choose what kind of artificial lawn it, in the here I do not do any device with subjective color's recommendation. However, in the I am home is the TurfSoccer artificial lawn, a artificial lawn industry pioneer, specializing in the production for 20 years, very close to the natural grasses. To borrow artificial lawn for us to create a warm environment, for a change mood, a good to grasp the a better life moments.
Would like to In the mental and physical exhaustion when the breathe to breath of nature do? Would like to In the holiday early morning sunlight under the carrying his a cup of Starbucks's of coffee watching the azure blue sky do? In fact, these very easy to get, as long as you possess a beautiful mood.
Wednesday, July 10, 2013
synthetic turf landscaping greening purpose is not allowed to make oxygen
For road use synthetic turf dragon West issue, the reporter linked to the new North municipal green management, a staff member surnamed Tang accepted an interview with reporters, he said, "can be divided according to purpose sports turf, ornamental type, slope type 3, and is currently used in many sports bentgrass turf grasses, turf and ornamental uses Zoysia, repens, bermudagrass and other grasses, the cost difference between the grass is not large, with emphasis on conservation . "
"Now the grass on the sidewalk pavement, public friends to cut corners, save time, like from the grass goes through the middle, but now that resistance to trampling superior synthetic turf, but also to prevent turf damage." According to this work personnel, landscape lawn to beautify the environment, eco-friendly primary purpose, the public does not have the function of relaxing walks, long-term members of the public to be treading on the lawn, the lawn will inevitably lead to the death of vegetation, affect the overall landscape, turf management unit also from the people traffic management and protection costs, and visual effects to consider, not recommended for people trampled lawn.
Using synthetic turf that has no effect on the vegetation it? The staff member said that, synthetic turf landscaping greening purpose is not allowed to make oxygen, laying on the vegetation is absolutely no effect, for laying raised by netizens irregular phenomenon, saying that he would order the rectification, but the laying of synthetic turf is temporary and will not completely replace the traditional lawn.
Friday, June 28, 2013
Professional football Grass-S50254
Professional football Grass-S50254
Features:
1)Natural appearance with beautiful matte bi-color
2)Made of traditional flat grass fiber
3)Quite competitive price in the market
4)High cost performance
Specifications:
Pile height 20-65mm
Yarn weight 8800 Dtex
Yarn type PE / Fibrillated
Color Field Green, Olive Green
Guarantee 6-8 years
This product information comes from TurfSoccer.
Friday, June 14, 2013
artificial turf Development has been gradually recognized
artificial turf Development has been gradually recognized
Currently, artificial turf has been well received by the school, organizational units, stadiums and other public places of all ages. Also, because the artificial turf carpet not only non-slip, dust, easy to clean, and the shape of real grass, a green feeling, now become a common upholstery, and get ordinary people's favorite, therefore, artificial turf market prospects are widely good, which is the domestic artificial turf manufacturers continue to emerge, the reason why the industry has developed rapidly.
artificial turf due to the use of chemical fiber materials, with durable, easy maintenance, and good surface uniformity, since the launch of the mid-1960s and has been favored by the market, especially suitable for surface flatness and uniformity requirements higher event. But it also has significant disadvantages, such as hardness, poor cushioning properties. Therefore, on the artificial turf and natural grass choice problems, has been in the sports venue managers, builders and related debate among scholars.
Construction costs made lawn Although there are many kinds of structures, construction methods also vary from place vary, but generally speaking, the basic structure can be summed up in three parts: the bottom is a base layer, an intermediate buffer layer, the above a lawn layer. Artificial turf base layer is the lowest level of the structure, usually by a dense layer of soil, gravel layer and asphalt concrete layer or layers.
The buffer layer is provided for cushioning shocks and design, it is usually composed of a compound of polyethylene closed cell foam, the thickness and composition of the buffer layer in a variety of large differences between the types of artificial turf; artificial turf of the lawn surface can be divided into produced in two ways: mosaic and woven, braided nylon woven grass, finished into mat, inlaid fiber length is longer and the lawn is larger changes.
In recent years, with the artificial turf in the manufacture of materials, weaving, and other aspects of the filler material and improve them with the difference between natural turf shrinking. In the 21st century, artificial turf use rationalize its use in international competitions has gradually been recognized. As FIFA President has decided, in 2010 FIFA World Cup South Africa on allowing the use of third-generation artificial turf.
Sunday, June 2, 2013
British established two major research institutions to detect and improve the quality of synthetic grass sports.
British established two major research institutions to detect and improve the quality of synthetic grass sports. In previous studies, (Winterbottom, 1985; Baker & Bell, 1986) for 9 bears professional football natural turf, synthetic grass 13 and 18 of the synthetic grass is used for testing the performance of motion detection, and thus made a series of national, regional and local turf quality evaluation criteria. The next study (Baker, 1989,1990), for the six natural grass in different weather and trampling damage cases were measured five times as Football League Committee on the golf course as part of the evaluation of the quality, is compared with another six man-made course. In these studies concluded that: between natural turf and synthetic grass in spring rate, the sliding friction properties, sliding distance and shock absorption capacity there are big differences, overall it seems synthetic grass has a faster than natural grass ball speed and a higher hardness. In addition to the third generation synthetic grass 7 also conducted with the same measurement. The results show that the physical characteristics of natural grass with the measured time and the performance of the different measurement regions are some differences.
Sw Baker and AR Woollacott on synthetic grass lawns with high-quality natural objective assessment. They assume professional football eight natural turf pitch at different times in each season for three observations, observation projects have the ball and stadium surface interactions (including ball bounce rate, rolling distance and its rate change) and athletes the reaction mass stadium (sliding friction properties, surface hardness and shock absorption, cushioning ability). synthetic grass bounce rate varied between 42-50%, the rolling distance of 5.4-9.9m between the sliding friction in the range of 37-60 N, the surface hardness of between 108-168Gmax.
Subscribe to:
Posts (Atom)

